Workgroup Contents

Lecture 15A.9 : Installation


Top

1. INTRODUCTION

1.1 Project Phases

1.2 Construction Philosophy

1.3 Installation Planning

2. LOADOUT AND SEAFASTENING

3. OFFSHORE TRANSPORTATION

4. OFFSHORE INSTALLATION

4.1 Removal of Jacket from Barge

4.1.1 Launch

4.1.2 Lift

4.2 Jacket Up-ending and Set-down

4.2.1 Up-ending by Ballast control and Flooding

4.2.2 Up-ending using the crane vessel

4.3 On-bottom Stability

5. CONCLUDING SUMMARY

6. REFERENCES

7. ADDITIONAL READING