Workgroup Contents
Top
1. INTRODUCTION
2. ERECTION PROCEDURES
2.1. Reception, Unloading and Handling of Construction Material.
2.2 Foundations and Base Plates (Levelling, Measuring, etc.)
2.3 Assembly and Erection
2.4 Bolting Connections on Site
2.4.1 Ordinary bolts
2.4.2 High-strength friction-grip (HSFG) bolts
2.4.2.1 The torque-control method
2.4.2.2 The part-turn method
2.4.2.3 Load-indicating devices
2.4.2.4 Installation
3. CONCLUDING SUMMARY
4. ADDITIONAL READING