Workgroup Contents

Lecture 16.3 : Re-use of Buildings


Top

1. INTRODUCTION

2. PRINCIPLES OF RESTRUCTURING

2.1 Typical Construction Sequence

2.2 New Internal Construction - Floor Systems

2.3 Connecting to the Facade

2.4 Retaining System for Facade as Part of Permanent Work

2.5 Restructuring Involving Modifications to Facade

2.6 General Considerations of Steel in Restructuring

3. CASE STUDY: WORKING QUARTERS AT FOLKWANG SCHOOL IN ESSEN-WERDEN, GERMANY

4. CASE STUDY: KANNERLAND, LIMPERTSBERG, LUXEMBOURG

5. CASE STUDY: THE ROEMERHOF IN ZURICH, SWITZERLAND [2]

6. CASE STUDY: OFFICE BUILDING WETERINGSCHANS 165, AMSTERDAM, NETHERLANDS

7. CASE STUDY: THE COURT OF JUSTICE IN ANCONA, ITALY

8. CONCLUDING SUMMARY

9. REFERENCES

10. ADDITIONAL READING